Manufacturing Facilities

Manufacturing Facilities
  • Machining WorkshopMachining Workshop
  • Custom Equipment WorkshopCustom Equipment Workshop
  • General WorkshopGeneral Workshop
  • Electrical WorkshopElectrical Workshop
  • Paint ShopPaint Shop
  • Robot Pre-AssemblyRobot Pre-Assembly
Manufacturing Capabilities
  • Laser Uncoiling and Blanking Production Lines (2 lines)Laser Uncoiling and Blanking Production Lines (2 lines)
  • CNC Turret Punch Presses (4 units)CNC Turret Punch Presses (4 units)
  • CNC Bending Machines (6 units)CNC Bending Machines (6 units)
  • CNC Hydraulic Guillotine Shears (8 units)CNC Hydraulic Guillotine Shears (8 units)
  • Automatic Bending MachineAutomatic Bending Machine
  • 12kW Laser Cutting Machines (5 units)12kW Laser Cutting Machines (5 units)
  • Laser Tube Cutting Machines (3 units)Laser Tube Cutting Machines (3 units)
  • Universal Flatbed Waterjet Cutting MachineUniversal Flatbed Waterjet Cutting Machine
  • Flat-bed CNC lathes (5 units)Flat-bed CNC lathes (5 units)
  • Horizontal CNC lathes (3 units)Horizontal CNC lathes (3 units)
  • Machining centers (9 units)Machining centers (9 units)
Storage of Finished Products
  • Pre-treatment and E-coat TankPre-treatment and E-coat Tank
  • Drying SectionDrying Section
  • Final Assembly ConveyorFinal Assembly Conveyor
  • Welding FixtureWelding Fixture
Quality Control Measures
  • Raw Material Inspection
    Material specifications are verified upon receipt, and key performance characteristics are sampled and tested to ensure compliance, preventing non-conforming materials from entering the production process.
  • Supplier Management
    For major outsourced components, on-site supervision is conducted to monitor critical production processes and ensure quality compliance at the source.
  • Manufacturing Process Control
    Critical process parameters are monitored throughout production, with real-time inspection and corrective actions implemented to ensure process stability and control.
  • Installation Control
    Assembly and installation activities are carried out in strict accordance with work instructions. Critical data is recorded, and post-installation functional verification is conducted to ensure compliance and performance.